Paragraphs in "Agreement Concerning A Joint Project For Planning, Design, Experiment, Preparation, Performance And Reporting Of Reactor Safety Experiments Concerning Containment Response" coded as SCOP

Label Provision
Art.3 III SCOPE OF THE PROJECT
Art.3.1x The scope of the project is to prepare and perform containment response tests at Marviken within the framework of an international cooperation.
Art.3.2x The project will be performed according to Appendices A-F and will aim at providing the contracting parties with further information mainly on certain dynamic phenomena in connection with containment blowdown situations.
Art.3.3x The framework of the project is laid down in the appendices to this Agreement:
Art.3.3x.ax Appendix A Description of programmes
Art.3.3x.bx Appendix B Instrumentation
Art.3.3x.cx Appendix C Organization
Art.3.3x.dx Appendix D Budget
Art.3.3x.ex Appendix E Time schedule
Art.3.3x.fx Appendix F Reports
Art.3.4x The project consists of three kinds of activities:
Art.3.4x.a a) planning and design
Art.3.4x.b b) experiment preparation and performance of the test programme and
Art.3.4x.c c) data reduction and reporting of data and interpretation of results
Art.3.5x The description in Appendix A reflects the fact that a certain minimum number of tests is necessary for the programme to be meaningful. It is consequently agreed that a minimum of 8 blowdown tests (blowdowns Nos 17 - 24) within the programme to be specified in accordance with Appendix A shall be performed.
Art.3.6x The time schedule contains reserve time which partly is intended for repetition of experiments if needed.