Paragraphs in "Agreement On Administrative Arrangements For The Prek Thnot (Cambodia) Power And Irrigation Development Project" coded as IMPL

Label Provision
Art.2 Article II
Art.2.1 1. The Government shall assume responsibility for the letting, supervision and administration of all contracts and for the execution of the project. The Government shall appoint the Corporation as its executive agent for the foregoing purposes and the operation of the project. If circumstances require the Government may request the Coordinator to consult with Cooperating Members and the United Nations Development Programme in order to provide technical and administrative assistance for the effective functioning of the Corporation; Cooperating Members and the United Nations Development Programme shall consult on how to meet such additional requests.
Art.2.2 2. The Corporation shall use the services of consulting engineers in the execution of the project in accordance with this Agreement. The consulting engineer for the construction of the dam, power station and diversion weir will be the Snowy Mountains Hydro-electric Authority which shall provide designs and specifications to the Corporation and shall advise the Corporation on the letting, supervision and administration of all contracts. The consulting engineer for the designs and specifications for the irrigation system will be appointed by the Food and Agriculture Organization of the United Nations acting as the executing agency of the United Nations Development Programme. The consulting engineer for supervision of the construction of the irrigation system will be the Snowy Mountains Hydro-electric Authority.
Art.2.3 3. The Snowy Mountains Hydro-electric Authority will provide engineering advice to the Corporation for the over-all planning and coordination of all features of the project; advise the Corporation on variations in contracts or other special measures required in response to unforeseen circumstances; tender advice through the Corporation to the Government and the Coordinator on measures necessary to strengthen the technical and administrative organization of the Corporation for the successful execution of the project.
Art.2.4 4. The Bank shall undertake, as necessary, the banking operations for the Project relating to contributions from Cooperating Members in accordance with this Agreement.